Air 59 Logistics Center

Air 59 Logistics Center

Highway 59 & Will Clayton Parkway, Humble, TX

Air 59 Logistics Center Building Image-web

Status: Under Construction
Property Type: Bulk Industrial
Project Type: Speculative
Size: 685,400 SF / 38.8 Acres

Brochure | Site Plan

Located in Humble, Texas, Air 59 Logistics Center is a 685,400 square foot cross-dock logistics facility. The site has visibility and direct access to I-69 (US 59) at Will Clayton Parkway. Building specifications include 40’ clear height, 60’ x 55’ column spacing, 65’ staging bays, 4 drive-in ramps, 242 trailer parking spaces, 332 auto parking spaces, ESFR sprinklers, 180’ truck court depth and office-to-suit. The property is two miles from the Houston International Airport. It also offers proximity to the Fed Ex Ground facility (7 miles), Port of Houston (25 miles), Houston Hobby Airport (27 miles) and Bayport Terminal (40 miles). Completion of the Class A building is scheduled for the second quarter of 2019.

Save

Park 100 Logistics Center

Park 100 Logistics Center

7352 Industrial Boulevard, Allentown, PA

park100-aerial

Status: Under Construction
Property Type: Bulk Industrial
Project Type: Speculative
Size: 1,460,160 Square Feet  / 92 Acres

Brochure | Site Plan

Park 100 Logistics Center, a rare infill development in the Lehigh Valley submarket, is a 92-acre site entitled for the development of 1.46 million square feet in a unique campus setting. The two-phased development will consist of twin 730,080 square foot state-of-the-art logistics buildings in a preeminent location less than two miles from the Rt. 100/I-78 Interchange. More than 40% of the U.S population can be reached within a day’s drive from this location.  Building features consist of 36’ clear height, 190’ dual truck courts, ESFR sprinkler system, 56’ x 50’ column spacing/70’ speed bays, 982 car spaces and 376 trailer spaces.  Rail is available to the property and provided by Norfolk Southern.

Interstate 80 Logistics Center

Interstate 80 Logistics Center

2200 Courage Drive, Fairfield, CA

i80

Status: Under Construction
Property Type: Industrial
Project Type: Speculative
Size: 378,405 Square Feet /19.6 Acres

Aerial | Site Plan | Website

Located in Fairfield, California, Interstate 80 Logistics Center features 36-foot clear height, 56’ x 60’ column spacing, 60’ speed bays, ESFR sprinkler system, 69 dock-high doors, 4 drive-in doors, 31 trailer parking spaces and 192 auto parking spaces. The City of Fairfield offers skilled labor, affordable housing, and a sophisticated, creative environment for business development. The cross-dock building is being developed on a 19.6 acre site fronting on Highway 12, strategically located just 1 mile from Interstate 80, the east-west route connecting San Francisco Bay Area and Oakland to Sacramento and the Central Valley. Construction of the Class “A” 378,405 square foot logistics facility is underway with completion scheduled in the Summer of 2019.

Haier GE Appliance

Haier GE Appliance

Steve Reynolds Industrial Parkway, Commerce, GA

haier

Status: Under Construction
Property Type: Bulk Industrial
Project Type: Build-to-Suit
Size: 1,099,880 Square Feet / 103 Acres

Aerial | Renderings

Ridgeline Property Group was selected to develop a 1,099,880 square foot build-to-suit for Haier GE Appliance in the Northwest bulk submarket of Atlanta in the city of Commerce, off I-85 North. The building is scheduled to be delivered in the Spring of 2019 and features include cross-dock configuration, 6,000 square feet of office, 36’ clear height, 200 dock doors, an all concrete truck court and 400 trailer parking spaces. The facility will be used to distribute kitchen and laundry appliances.

Southwest International Gateway Business Park

Southwest International Gateway Business Park

El Campo, TX

elcampo-aerial

Status: In Design
Property Type: Bulk Industrial
Project Type: Build-to-Suit
Size: 540 Acres

Brochure | Renderings | Site Plan

The SW International Gateway Business Park is a premier 540-acre
rail-served, industrial park located in El Campo, Texas, approximately 65
miles southwest of Houston. This multi-modal logistics Park will offer
frontage to the US 59/I-69 NAFTA Superhighway and will provide access,
visibility and rail service to and from Mexico via Kansas City Southern
Railway. Upon full completion, the park will accommodate up to 8,000,000
square feet of Class A warehouse, manufacturing and rail-served distribution
facilities.

Channahon Business Center

Channahon Business Center

23400 US Route 6, Channahon, IL

channahon

Status: Under Construction
Property Type: Bulk Industrial
Project Type: Speculative
Size: 442,000 Square Feet / 28.68 Acres

Brochure | Site Plan | Website | Video

Channahon Business Center is located at the recently renovated Route 6/I-55 interchange, which happens to be first interchange south of the intersection of I-55 and I-80, one of the most significant intersections in the Midwest for logistics and transportation.  The project offers cross-dock configuration with 83 dock doors, 4 drive-in doors, 90 trailer storage positions, ample car parking and the ability for a client to fully secure the facility. It is situated in the low-tax Will County environment and provides abundant access to labor. Completion of the project is anticipated in the fourth quarter of 2018.

Whirlpool (Expansion)

Whirlpool

13201 South Orange Avenue, Orlando, FL

whirlpool-expansion

Status: Under Construction
Property Type: Industrial
Project Type: Expansion
Size: 249,756  Square Feet /8.42 Acres

Site Plan

Ridgeline Property Group was selected to develop a 249,756 square foot expansion to the existing 500,000 square foot Whirlpool facility in Orlando, Florida. The 480’ wide x 530’ deep addition will feature 80’ loading bays, 30’ clear height, 28 dock positions, 85 auto spaces and 51 trailer spaces. Construction is underway and completion is scheduled for Fall 2018.

McDonough Logistics Center

McDonough Logistics Center

875 Highway 42 South, McDonough, GA

mcdonough

Status: Under Construction
Property Type: Bulk Industrial
Project Type: Speculative
Size: 728,000 Square Feet /81.17 Acres

Aerial | Site Plan | Brochure

Ridgeline Property Group’s McDonough Logistics Center, located in Henry County, is a 728,000 square foot facility scheduled for completion in the Spring of 2019. Features of the 520’ x 1400’ building include 50’ x 56’ bay spacing, ductilcrete floor slab, TPO roof system, 148 dock doors, 4 drive-in doors, 300+ auto parking spaces and 210 trailer parking spaces.

Greenwood 75 Logistics Park

Greenwood 75 Logistics Park

Greenwood Industrial Parkway, McDonough, GA

greenwood

Status: In Design for Site Work
Property Type: Bulk Industrial
Project Type: BTS or Speculative
Size: Up to 1,001,700 Square Feet / 56 Acres

Aerial | Brochure | Site Plan

The Greenwood 75 Logistics Park is a 1 million square foot development located in the I-75 South / McDonough Industrial corridor. The site is being restored to ‘pad ready condition’ to accommodate 1,001,700 SF with 302 vehicle/255 trailer spaces and 215 dock doors/4 drive-in doors. The site work will commence Summer of 2018.

Park 78 Logistics Center

Park 78 Logistics Center

70 Bordnersville Road, Jonestown, PA

Status: Under Construction
Property Type: Industrial
Project Type: Speculative
Size: 345,600 Square Feet / 33 Acres

Aerial | Brochure | Site Plan

Park 78 Logistics Center is situated in a premier location with direct access to I-81 and I-78 in Jonestown, PA. The 345,600 square foot, rear load design building has tremendous freeway visibility, 36’ clear height, ESFR sprinkler system, 63 dock doors, 252 auto stalls, up to 80 trailer stalls and the LERTA Tax Abatement Program in place. Completion is scheduled for Fall 2018.

Park 840, Building 100

Park 840, Building 100

SE Corner of Central Pike & I-840, Lebanon, TN

Status: Under Construction
Property Type: Bulk Industrial
Project Type: Speculative
Size: 558,600 Square Feet /  29 Acres

Brochure | Site Plan | Website

Park 840 East, Building 100 is a Class A, 558,600 square foot distribution/logistics facility located at the southeast corner of Central Pike and I-840 in Lebanon, TN, east of Nashville. The location provides highway visibility and convenient access to I-840 and Nashville’s extensive interstate system that connects distributors to major markets across the Southeast and Midwest. The building will feature concrete-tilt panel construction, cross-dock configuration, 36’ clear height, 56’ x 50’ column spacing, 62.5’ speed bays, 96 dock doors + 4 drive-in doors and 113 trailer stalls. Completion is scheduled for Fall 2018.

Save

I-269 Logistics Center

I-269 Logistics Center

Goodman Road & SE Corner of I-269, Marshall County, MS

I269-siteplan

Status: In Design
Property Type: Industrial
Project Type: For Lease/For Sale/Build-to-Suit
Size: 100,000 – 1,744, 000 SF / 328 Acres

Brochure | Site Plan

I-269 Logistics Center is 3.5 million square feet of proposed Class-A distribution and industrial space available for build-to-suit. Located at the intersection of Goodman Road and the Southeast corner of the new I-269 beltway, the site provides excellent access to I-55 , I-40 and I-22 into large consumer markets throughout the Southeastern US. Buildings available from 100,000 to 1.7 million square feet and ready 5 ± months from lease execution. Proposed property highlights include 32′ – 36′ clear height, 50′ x 54′ bays, 60′ running bays, high efficiency T-5 light fixtures, ESFR sprinklers and 7″ floor of 4,000 PSI unreinforced concrete. The site has foreign trade zone eligibility. 70% of the entire U.S. population can be reached within 48 hours.

Hanover Business Center

Hanover Business Center

1250 Stoney Run Road, Hanover, MD

Status: Under Construction
Property Type: Industrial
Project Type: Speculative
Size: 101,000 Square Feet / 7.8 Acres

AerialSite Plan |  Brochure

The 101,000 square foot Hanover Business Center is minutes from the Baltimore/Washington International Airport. Project features consist of 28’ clear height, 26 dock doors, 2 drive-in doors, 50′ x 50′ column spacing, 120’ truck court and ESFR fire sprinklers . The 7.9 acre site is just 10 minutes (5.4 miles) from Interstate 95 and only 21 minutes (11.5 miles) from the Port of Baltimore. Completion is scheduled for summer 2019.

Save